1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answers were Sorted based on User's Feedback
Answer / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Answer / gowrishankar
Plastering per day 8 hours one mason and helper will cover 10 m2
| Is This Answer Correct ? | 321 Yes | 61 No |
Answer / jarrar siddique
1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.
2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.
3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.
| Is This Answer Correct ? | 78 Yes | 8 No |
Answer / vijay kumar mukhiya
80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper
| Is This Answer Correct ? | 73 Yes | 14 No |
Answer / sunil patel
One mason and one Labour minimum 100 sqf plastering should be finished in 8 hours.
| Is This Answer Correct ? | 31 Yes | 8 No |
Answer / yashvant
ready made plaster work one meson can do 12 square meter per 8 hour duty and 2 hour overtime this is enough work as per construction company standard measurement in Dubai.
| Is This Answer Correct ? | 34 Yes | 15 No |
Answer / gowtham
One Mason and one helper per 8 hour plaster work for 10 m2 and overtime 2 hours 2 m2.totally 12 m2
| Is This Answer Correct ? | 6 Yes | 5 No |
Answer / yashvant
80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.
| Is This Answer Correct ? | 20 Yes | 23 No |
Answer / ramji
One meson one helper 8hours150sq,m plenty plaster
| Is This Answer Correct ? | 1 Yes | 23 No |
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What is factor not to be taken in consideration in mix design?
What Are The Steps Involved In The Concreting Process, Explain?
Define mirror?
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
how do you calculate cubic meter to brass
CM 1:4 !:5..what CM stands for?? and what is standard ratio used for external plaster??
25. Are you willing to work overtime?
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)