25. Are you willing to work overtime?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Incase of project demand, i am ready for it.
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / jemiah
Absolutely. If the job calls for it and the overtime pay is good, why not>
| Is This Answer Correct ? | 3 Yes | 1 No |
please briefly explain calculating or estimating steel quantity for a RCC column?
what is FPS brick
how to do sudoko puzaals?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
what is the coefficient for running feet to cft coversion both area and price
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Why does the pressure increase under soil?
At which temperature in deg Celsius Asphalt is used for the pavement of Roads?
what is the full form of GGBS?
what is diversion?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)