25. Are you willing to work overtime?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Incase of project demand, i am ready for it.
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / jemiah
Absolutely. If the job calls for it and the overtime pay is good, why not>
| Is This Answer Correct ? | 3 Yes | 1 No |
Are you having any structural design experience?
4 Answers Ajnara Group, Jeyam Homes, L&T,
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
What glue is least sticky?
M30 me kitan pani lagat hai
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
What is Soil & Whats the type of soil are there? What is Ultimate & safe stress?
Minimum and maximum size of the building components
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
can any one explain bar bending schedule of bems and columns and slabs ??
What is the DENSITY of 20mm Course aggregate?
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
What is cementation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)