1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answers were Sorted based on User's Feedback
Answer / sajan
One mason and helper 8 hours minimum 25 sq.m want to do.
| Is This Answer Correct ? | 16 Yes | 40 No |
Answer / sunil
One Mason with one helper 20-25 sqm plaster should be finished
| Is This Answer Correct ? | 14 Yes | 55 No |
Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
how much shouid be the rate for ready mix concrete per cubic meter
How can we improve the capacity of a existing foundation?
how to explain soil classification
what is the anchorage length of reinforcement.
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
4. What is your philosophy / attitude towards work?
WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
How much will be Concrete required for one Sq.meter of area for building work?
2 Answers PSD, SMC, Tudor Infrastructures,
How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
1- what is steel rebar cover? 2- what is a rebar stirrup?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)