why cutting length in design of beam is rounded more for -r/f
& less for for +r/f
why only water cement ratio always......why not water sand ratio while making concrete
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how to know the one way or two slab
3 Answers ASC, Harmal Enterprises,
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
what affect on the structure and related beam of slab when provide one way slab insteade of two way slab
How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".
mix design concrete m30 for elevated water tank
What is the cost difference between site mix and ready mix concrete per cubic meter
what are the types of dimensioning?
how to find hardness of water?why it should be determined?
What are the different theories of failure under static load?
What should be the Min.Penetration in a hard rock for all pile diameteres?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)