CM 1:4 !:5..what CM stands for??
and what is standard ratio used for external plaster??
Answers were Sorted based on User's Feedback
Answer / ansar khan
plaster on rcc 1:4 and plastar on brick work 1:6
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rohit singh
For external plaster 1:4 have perfect
1-cement
4-sand
| Is This Answer Correct ? | 0 Yes | 0 No |
how many cement bags required for one cum of brick work the brick size is 20x10x10.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to cal. The weight of hollow pipe?
What is critical path method (c.p.m)?
which type of test carrying on the cement & why
What is the meaning and full form of FTA and MTA in plumbing material
sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,
if 6.0M x3.0M Boat floating on water One person Sit on Boat Then the boat Sink about 15cm .Then what is the wt of person.
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
what are the checks to be performed while fixing a door and a window frame..at site??
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)