Answer / ansar khan
plaster on rcc 1:4 and plastar on brick work 1:6
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rohit singh
For external plaster 1:4 have perfect
1-cement
4-sand
| Is This Answer Correct ? | 0 Yes | 0 No |
define the authorized overlap in columns
how many BSCs can i connect to the HUAWEI MSC
What is differences between torsion and buckling?
How much bricks in 1sq.meter with thickness 9inch.
what happened if the diameter of capillary tube is double then the capillary rise will be
polavaram project is situated inwhich place?
what is pH value of sewage&water.if pH value is given then how to calculate H+.
what is anchor bar??
sir tell me what are the rules to find out the cut length? and what is the deduction in dia to be made ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
0 Answers L&T, Shoba Devlopers,
In case of tunnels (Railway) what is the way of securing a wall beam?
how to calculate total cost for slab 35'×8'
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)