1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / rajan pandey

their two ans is right

Is This Answer Correct ?    13 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many days should curing of plastering, brick work and concrete

1213


Is it possible to make a feature using an overdefined sketch?

763


Please tell me vasthu room sizes. Thanks.

1766


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2043


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5613






what is relation between SPT N value and driving piles after conducting a soil test?

1589


What does civil status mean?

686


For what purpose bedding is used under storm water drains, explain?

757


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

1839


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

5569


What is factor not to be taken in consideration in mix design?

3088


a butt weld is specified by

2593


What are the reasons for geotechnical site investigations in uganda?

655


What is unit weight of normal concrete?

682


in plate load test what is the thickness of plate 20mm 5mm 50mm none

1718