1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / rajan pandey
their two ans is right
Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
How many days should curing of plastering, brick work and concrete
Is it possible to make a feature using an overdefined sketch?
Please tell me vasthu room sizes. Thanks.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what is relation between SPT N value and driving piles after conducting a soil test?
What does civil status mean?
For what purpose bedding is used under storm water drains, explain?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What is factor not to be taken in consideration in mix design?
a butt weld is specified by
What are the reasons for geotechnical site investigations in uganda?
What is unit weight of normal concrete?
in plate load test what is the thickness of plate 20mm 5mm 50mm none