what should be the strength of Concrete cube strength for 7
days, if the designed mix is M20?

Answers were Sorted based on User's Feedback



what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / viki

generally concrete attains 60-70% of its 28 days strength
in 7 days.After 28 days strength of M20 concrete will be
20N/mm2.so after 7days it would be 12-14 N/mm2.

Is This Answer Correct ?    113 Yes 28 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / dee

exactly 67% which is 13.7 n/mm2

Is This Answer Correct ?    54 Yes 16 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / n.c.pathan

Concrete does attain strength of about 65% after a period
of 7 days. With good quality of cement nowadays available
we generally get better results. Many a times strength
exceeds 70% of 20N/SQ MM.

Is This Answer Correct ?    27 Yes 10 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / g.mugesh

Grade of concrete:m20

7days test (67.5%) - 20*67.5/100=13.35 N/MM2
28days test(100%) - 20 N/MM2

Is This Answer Correct ?    19 Yes 10 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / himanshu sekhar pradhan

Actuall all grade of concrete design upon its target
strength. Then for M20 we have to design the mix on
26.6N/mm2 and all grade of concrete should achive its 60 -
75% strength in 7days. Then the actual strength of M20
grade of concrete at 7days should be 17 -20 N/mm2.
Otherwise there is chance of fail.

Is This Answer Correct ?    11 Yes 4 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / sumit

Design mix is M20 So Target strenth is Fck+4 = 24N/MM2

For 7 Days Cube strenth is 16.24 Exact (7days@67.67%)

For Individual Cube strenth become is Fck-3 = 13.24

But Average Sternth is required is 16.24 (must)

For any Civil engineering related questions
Contact by mail skatiyar011@yahoo.in

Is This Answer Correct ?    10 Yes 6 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / sathish

Actually concrete attains 64-70% of its 28 days strength
in 7 days.After 28 days strength of M20 concrete will be
20N/mm2.so after 7days it would be 12.80 -14.00 N/mm2.

Is This Answer Correct ?    8 Yes 5 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / nithin

Is there any reference to 7 day strength in is codes.

Is This Answer Correct ?    4 Yes 1 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / sandeep

If grade of concrete is M20
Then after 7 days it will be 2/3 of 20 n/sq mm
Means 0. 666*20 = 13. 20 n/sq mm

Is This Answer Correct ?    1 Yes 0 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / devendra jatav

7 days - 70 to 75% strength
28 days - 100% strength

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

cement quantity in 1 M3 pcc

2 Answers  


can any give me bhel n other govt sec interview question

1 Answers  


whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???

2 Answers   Harit Dharaa,


How to do base isolation for RC framed structure using ETABS software?

0 Answers  


Definition of plinth beam & Uses.

4 Answers   Atlantic Projects,






What"s mean by water bound macadam road(WBM)?

11 Answers   Simplex,


Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)

5 Answers   Clover, Rites,


what is mix design

23 Answers   Power Grid,


I want to know about history of civil engineering?

1 Answers  


what is the percentage of silt in black cotton soil.?

0 Answers  


1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?

3 Answers   TPSC,


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

0 Answers   LOreal,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)