1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / gowtham
One Mason and one helper per 8 hour plaster work for 10 m2 and overtime 2 hours 2 m2.totally 12 m2
| Is This Answer Correct ? | 6 Yes | 5 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
what is Bearing Capacity,How to determine it?
what is the weight of 6000 psi concrete in lb/cft?
Why the statue of liberty is made of copper?
Cement consumption of one cubic meter of aerocon blocks masonry?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
For the construction project what capital cost has to be taken in consideration?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
what is Brick crushing strength(PSI)?
how do you stabilize a waterlogged area in road construction
What is Base Shear ?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
cause of cylinder test failure
For what building Built-on balconies are preferable? What are the advantages?