1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Post New Answer View All Answers
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Explain what is progress payment?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What are the important hardware systems used for cad?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
how to caluclate sienerge qty in construction in ap
how statics is different from dynamics
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what is difference between fluidity and workability also how palsticizer works
what is stressing
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is meaning of tlc