1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
Is This Answer Correct ? | 473 Yes | 70 No |
Post New Answer View All Answers
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
If specific gravity of cement is less than 3.15 what is the cause?
What are segregation and bleeding?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Which are the top apps for you civil engineer?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
In jack arch floor, the rise is kept?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is the difference between Hinged and pinned in Column ends
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
In which code the the maximum height of concrete casting has been explained