1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Post New Answer View All Answers
Define What does civil status mean?
what is the effect of duration of earth quake on framed structures ?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
Calculation of curtain wall of box culvert
what could be the production cost of 1 cum of concrete by CP30 plant
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What is aggregate?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
how to calculate the strength of rebound hammer test reading in building construction ?
what is the difference between tsp & tower
What is the difference between 53 grade and 43 grade cement