1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / jarrar siddique
1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.
2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.
3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.
Is This Answer Correct ? | 77 Yes | 8 No |
Post New Answer View All Answers
What is the material consumption- cement,sand,tiles etc for Toilet dado?
How to hide dimensions in autocad?
what is the breaking strength of wall tiles
what are the challenges of being a team leader and a supervisor?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
calculate the quantity of water for 1:6 cement mortar
Define What is the tensile strength of wood?
What is the tensile strength of marble?
How many axes do cartesian coordinate system has?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what else we can add rather than admixture in concrete to reduce the cement quantity?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
what is thumb rule for calculating the size of ISMB required for a particular length of span
what is the percentage of silt in black cotton soil.?