1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / jarrar siddique
1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.
2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.
3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.
| Is This Answer Correct ? | 78 Yes | 8 No |
Post New Answer View All Answers
what discoveries did you have in relation to your course?
How much time Required for PPR pipe network testing
Explain moment of inertia?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
what is the specific gravity of rubble in plum concert
how i convert mm into standard wire guage (SWG)no.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how to calculate the concrete mix m30 by volume
how to calculate reinforcment in staircase cranked beam?
Explain what are the problems one might face while having a Cantilever balcony?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
what is the difference between natural draught cooling tower and induced draught cooling tower
How much cement,sand,bricks and water needed for 1square metre brick work?
what is idealized curve for concrere and steel