1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / yashvant

80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.

Is This Answer Correct ?    20 Yes 23 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2362


though u r a civil engineer, y r u interested in tcs???

2175


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

1377


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1328


How many are the types of joints?

692






WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1858


what else we can add rather than admixture in concrete to reduce the cement quantity?

5326


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10228


how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1453


how to calculate number of bitumen for road asphalt

974


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

670


mix design procedure for 1:6 cement mortar

1745


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2135


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1299


How is make concrete cube?

709