1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / vijay kumar mukhiya
80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper
| Is This Answer Correct ? | 73 Yes | 14 No |
Post New Answer View All Answers
What is the strongest bridge for a school contest?
Which IS Code/American Code applied for coupler test of steel
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Which code is used for tor & tmt steel bar?
what is detail procedure of eccentric footing? plz. give solved exmple?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What are the joints wants to made in masonry where door opening, arches like etc..
What is the per cu. mt. price of ready mix in Gujarat region.?
How do you prepare Material Recovery Statement for deduction from contractors bills?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
why is the column design?
what is the difference between replacement of cement by groundnut shell ash
which red: used in roof teping, then use only cement
Why you are leaving present job?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?