1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / vijay kumar mukhiya
80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper
Is This Answer Correct ? | 71 Yes | 14 No |
Post New Answer View All Answers
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
What is Time period of a building and its relation with frequency ?
pls tell me , what is the water content
punj loyed and sapurjl palanjl
why demand factor less then 1 ?
All aptitude question of Bechtel
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is the diameter of the 3"inch nails?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
types of laps in column
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
residential projects,structural.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?