1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / vijay kumar mukhiya

80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper

Is This Answer Correct ?    71 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1601


What is Time period of a building and its relation with frequency ?

747


pls tell me , what is the water content

1674


punj loyed and sapurjl palanjl

1889


why demand factor less then 1 ?

1775






All aptitude question of Bechtel

1427


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

970


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1037


What is the diameter of the 3"inch nails?

1527


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1822


types of laps in column

1923


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

10654


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10832


residential projects,structural.

2417


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1681