It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.
Is This Answer Correct ? | 24 Yes | 4 No |
Answer / azam
The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.
Is This Answer Correct ? | 21 Yes | 3 No |
as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.
Is This Answer Correct ? | 12 Yes | 1 No |
Answer / sahilshah.civil@gmail.com
As per IS 456:2000
a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below
props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day
props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mitesh patel
Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ananth
span length below 4.5m 7 days
span length over 4.5m 14days
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / sagar tiwari
span length over 6m than 28 days
span length below 6m than 14 days
span length over 4.5m than 14 days
span length below 4.5m than 7 days
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vinaysagar donakanty
The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.
Is This Answer Correct ? | 0 Yes | 0 No |
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is full form of SNF base in concrete mix design for admixture percentage?
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
volume of one cement bag
4 Answers Grand Peaks, Omace, Swasudha Infra,
what is raft foundation
The point of contraflexure occurs in
how much wall area covered by 1 kg of lapi(putty)
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What is CRMB ? And how it is beneficial to the service life of the road?
how lap length is increased with increase of Grade of steel?
Difference between lateral ties and stirrups?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?