rate analysis for cement pointing 1:4 , for 100 sq m
No Answer is Posted For this Question
Be the First to Post Answer
What are the types of ladders?
any book or article on pumped concrete.
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
acceptance criteria for concrete works
quantity of cement required for M35 grade reinforced cement concrete
What is geopolymer based concrete?
What is plasticiser and where it will use?
what will happen if we pass electric current through rebars of RCC Slab(is there any strength reduction of concrete during this)??????????
2 Answers Precast, SPC Systems,
compression strength of first class brick should be
Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)