what is right time of slab DE shattering and beam boo tam.
Answer Posted / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What is factor not to be taken in consideration in mix design?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
types of survey and levelling instrument ?
How to find out kg per Sft ?
pls mail some more tecnical qustions at msaranya2610@gmail.com
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
How much cement and sand required for 9"brick wall per square metre
Differentiate first angle & third angle projection?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
what r the precaution for high in atp tempareture,low in atp tempareture
Define What is the tallest man made structure in the world?
How is make concrete cube?