what is right time of slab DE shattering and beam boo tam.
Answer Posted / map
It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.
| Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
Why are the bolts that hold steel rails together in oval holes?
What is the l/d ratio of cantilever beam?
What is absolute pressure? How absolute pressure is calculated?
How to estabilish reinforcement Steel rolling margin for a building projects ?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the tallest man made structure in the world?
a butt weld is specified by
Which are the top apps for you civil engineer?
what is c4x light weight cement blocks
How much is the cover for slab?
What is geopolymer based concrete?
what are RIB slabs explain about it
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
how to nfind out the specific gravity of sand.aggregate,water please help...
what is castigliano theaorem