what is right time of slab DE shattering and beam boo tam.
Answer Posted / map
It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.
| Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is m30 in concrete tiles
what is the tensile strength of 10swg and 8swg gabion wire?
Define a polyline?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
What are the different types of foundation?
What is the diameter of the 3"inch nails?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How do you calculate the unit weight of concrete?
What is the difference between linear dimension and aligned dimension?
what is tension footing?
How to do base isolation using ETABS software?