what is right time of slab DE shattering and beam boo tam.
Answer Posted / r.ranjith kumar
slab de shetting 2 day
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
why do we provide haunches in rcc box or underpasses?
How do we test on design and style in a software?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
How do we calculate the power of centrifugal pump?
When column of building is abutting the boundary line,then suitable footing advised is
How is calculate the cube molt
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Design a rectangular channel.
What is meaning of FREE STANDING STAIRCASE ?
What is the biggest dam in america?
how do you stabilize a waterlogged area in road construction
What is the difference between yeild strength and compressive strength of steel???