what is right time of slab DE shattering and beam boo tam.
Answer Posted / sahilshah.civil@gmail.com
As per IS 456:2000
a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below
props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day
props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to calculate valuation for the old building?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
pls give me some basic informations in construction of a structure?
What is M40 _ TOR - EQ and B.F.S
What is the zero value in quantity surveying
What are the phases inspections are done by local authority while construction?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
Explain what is change order request?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
what is the name of shuttering oil used in oman
Will water damage concrete?
what is the difference b/w full length and cutting length?
use ofr concrete as per grade ?