there is a residential building
L = 20' B = 30' H = 20'
stairs L = 3' H = 20'
calculate the numbers of Threads and risers from stairs with formula
Answers were Sorted based on User's Feedback
Answer / pavar
Riser= H/6" -(6")=20'/6"-(6")=39 Risers.
Threads=l/10"=40 threads.
Is This Answer Correct ? | 2 Yes | 5 No |
what do you mean by 'redistribution' of forces?
Method of findingthe dry ingredient quantity of 1 m3 concrete.
25 Answers Annai Infra Developers, GKC Projects Limited GKCPL, IRE, L&T, Mahle Filter Systems, NCC, PNRD, Rama, RCC, Shivani Agriculture, Sobha Developers, Suraj Constructions, TCL,
what is a steel formula
how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
16 Answers ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,
Why are steel plates inserted inside bearings in elastomeric bearing?
What are the Noms/8hr for Concrete Work for Mason,Carpenter,Steel Fixer
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
List out the densities of different construction materials such as brick, steel, sand, aggregate etc...
how to calculate the density for high density concrete ? or is it same as the density of RC?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
0 Answers Suraj Constructions,
Soil bearing capacity formula
CALCULATE QUANTITY OF RCC COLUMN