what is right time of slab DE shattering and beam boo tam.
Answer Posted / sagar tiwari
span length over 6m than 28 days
span length below 6m than 14 days
span length over 4.5m than 14 days
span length below 4.5m than 7 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Consumption of Binding wire for fixing of cover block in vertical surface
What are your future hopes for this job?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
How to do base isolation for RC framed structure using ETABS software?
How many are the types of joints?
How to do bbs in excel format
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
What is soil enforcement?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Differentiate first angle & third angle projection?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
The mixture of different ingredients of cement is burnt at?
What is the difference between undo & redo?
How to build the floor to ceiling bookcase?
How much time Required for PPR pipe network testing