Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?

Answers were Sorted based on User's Feedback



plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / siva rami reddy

Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.

Is This Answer Correct ?    90 Yes 18 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / vignesh

p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c

Is This Answer Correct ?    31 Yes 2 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / aparajita swain

Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm

Is This Answer Correct ?    46 Yes 18 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / vkg

cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags

Is This Answer Correct ?    29 Yes 19 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / ehaque9499

If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.

Is This Answer Correct ?    22 Yes 14 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / ghantola

The price/rate will depend on grade of materials used and geographical location.

Is This Answer Correct ?    9 Yes 2 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / p jagan

Rcc 1cft rate is 250/- in kurnool I want PCC rate 1 4 8ratio

Is This Answer Correct ?    5 Yes 0 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / rajeeb lochan rout

If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.

Is This Answer Correct ?    14 Yes 10 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / mohd abdul raheem

Sir I want to know how much charge for RCC slab area about 1100 sqft ready mix concrete

Is This Answer Correct ?    1 Yes 1 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / nobika mano

PCC for M10 = 7400/cum
Footing RCC for M40 =10500/cum

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the difference between compaction and consolidation?

4 Answers  


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

0 Answers  


calculation of cement bags in 1:2:4 concrete mix

26 Answers  


Can we use PPC cement for RCC works? Upto which grade it can be used?

3 Answers  


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

0 Answers   CECL, HTC,


what is curve ranging??

1 Answers  


what is the thickness mortar between two bricks

14 Answers   bscpl, L&T,


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

0 Answers   APGenco, Emaar, Madhucon,


What is the purpose of the gap in the road on this bridge?

0 Answers  


What is the IS code for cube testing?

2 Answers   Rites,


how can we construct building without foundation providing only grade beam at ground level

0 Answers  


plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?

11 Answers   L&T, Sobha Developers,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)