plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answers were Sorted based on User's Feedback
Answer / siva rami reddy
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
| Is This Answer Correct ? | 90 Yes | 18 No |
Answer / vignesh
p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c
| Is This Answer Correct ? | 31 Yes | 2 No |
Answer / aparajita swain
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
| Is This Answer Correct ? | 46 Yes | 18 No |
Answer / vkg
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
| Is This Answer Correct ? | 29 Yes | 19 No |
Answer / ehaque9499
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
| Is This Answer Correct ? | 22 Yes | 14 No |
Answer / p jagan
Rcc 1cft rate is 250/- in kurnool I want PCC rate 1 4 8ratio
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / rajeeb lochan rout
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
| Is This Answer Correct ? | 14 Yes | 10 No |
Answer / mohd abdul raheem
Sir I want to know how much charge for RCC slab area about 1100 sqft ready mix concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / nobika mano
PCC for M10 = 7400/cum
Footing RCC for M40 =10500/cum
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between compaction and consolidation?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
calculation of cement bags in 1:2:4 concrete mix
Can we use PPC cement for RCC works? Upto which grade it can be used?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is curve ranging??
what is the thickness mortar between two bricks
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
What is the purpose of the gap in the road on this bridge?
What is the IS code for cube testing?
how can we construct building without foundation providing only grade beam at ground level
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)