how to caliculate required amount of cement and sand required
for 1cu.m.
No Answer is Posted For this Question
Be the First to Post Answer
How many times one TMT bars bents & straight upto not broken the bar.
What is design life of a bridge?
Please tell me about building work from begining
What is used for 1cubicmeter steel ? 1meter length square pipe how many weight ?
Define What is aggregate?
what is inspection?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
anyone can tell me the consumption of steel and concrete per sqft.?
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
Difference between pre-tensioning and post-tensioning.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)