plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answers were Sorted based on User's Feedback
Answer / amitkumarkushwaha
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
Is This Answer Correct ? | 14 Yes | 15 No |
convert= kg into brass
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
what is mean by c32/40s concrete class
in railway engineering, what are the types of guages? what is its size,length & thickness?
what is mean by bond strength?
Different sizes of Hollow blocks and its weight. Thanks.
Generally construction is based on which method:limit state of working stress
3 Answers Mars Planning Engineering Services, Sterling Wilson,
what is the formular for measuring minimum depth of a foundation
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
The definition of national highway
Define slump in terms of slump test