Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
| Is This Answer Correct ? | 90 Yes | 18 No |
Post New Answer View All Answers
What are the basic use of runners and standards of pipelines?
What is the difference between engineering stress and true stress?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
Define What is rigging?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
what is pile and deam foundation
what is escalation?how it is done?
how many types of survey and what are levelling instrument?
How to calculate quantity of plum masonry in 1:3:7
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what does the grad of cement shows (denotes)?
What is horizon or horizontal mining?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...