plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / aparajita swain
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
Is This Answer Correct ? | 46 Yes | 18 No |
Post New Answer View All Answers
Write short note on construction programme for pile foundation.
in design case of structural member best suitrable percentage of steel limit is what
.5Ast
Explain major differences between routing maintenance and major maintenance.
how to caliculate required amount of cement and sand required for 1cu.m.
types of survey and levelling instrument ?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Which is the direction for positive angle?
Why is concrete cube test carried out?
How will you reduce the concrete flow after mixing the concrete
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
How much cement is require in one sqft area in a G+3 residential construction.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
How many days should curing of plastering, brick work and concrete