plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / aparajita swain
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
| Is This Answer Correct ? | 46 Yes | 18 No |
Post New Answer View All Answers
what does the grad of cement shows (denotes)?
What are the main reasons for conducting pull-out tests for soil nails?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is called the inverd level of mabhole chamber?
what is called Bulk Density of aggregate?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is the absolute pressure scale?
Define a polyline?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How long does it take concrete to harden?
What is the origin of name railway sleepers?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What is the Null Point of chimney in Power Plant
How to find out kg per Sft ?