plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / ghantola
The price/rate will depend on grade of materials used and geographical location.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
how to create our resume?
at which depth the construction of tunnel is economical from cost and engineering aspect.
how we can find sieve #4 is 4.75mm?
Who name us Engineer & Why?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What is zoning permit?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
Time required for curing of wall tiles before fixing
what is pqc
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
what is detail procedure of eccentric footing? plz. give solved exmple?
what is mean by reestimation?
explain the advantages of total stasion
What are moment of inertia and its importance in civil engineering?
how to design and calculate materail quantity for concrete speedbreaker ?