plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / nobika mano
PCC for M10 = 7400/cum
Footing RCC for M40 =10500/cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Will water damage concrete?
five benefits of using standard terminology in the measurement process
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
how much tempareture are required to make liquid state of pid leed
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is the difference between built area and super built up area?
What is the difference between linear dimension and aligned dimension?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What is difference between combin footing & rapt footing
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete