Answer / suresh k
Bricks 500 no.
Cement 1.6 bags
Sand 0.3 cub-meter
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / sai ganneshh
sand=0.20cum(1cum*0.20=0.20cum)
1 cum cement= 0.20*1440/ratio last digit
if(1:5) cement =0.20*1440/5=57.6kgs
1 bag =50kg
(57.7/50=1.154bags)
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / satinder singh
brick size= .230*.115*.75
1/.230*.115*.75 = 500
10 mm mortar consider now our brick size is .240*.125*.85
1/.240*.125*.85 =500
392 = 500
500-392= 108 bricks
now 108*0.00255 = 0.275 cu m
for mortar 1:6
cement = 1/7*0.275 = 0.0393/0.0345 = 1.13 bag
sand = 6/7*0.275 = 0.023 cu m
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / gulshan vashisht from hassanpu
brick = 476 (as pr calculation)
.3= dry volume of brick mortar
cement = .3*28.8/total of ratio(6)
= 1.44 begs in one cum
sand = .3*quantity of sand(5)/total of ratio
= .250 for one cum
| Is This Answer Correct ? | 5 Yes | 7 No |
Answer / neelesh chouhan
Bricks = 500 no.
cement = 1.762
sand = 0.306 cum
| Is This Answer Correct ? | 10 Yes | 12 No |
Answer / neelesh chouhan
Bricks = 500 no.
cement = 1.762 beg
sand = 1.836 cum
| Is This Answer Correct ? | 6 Yes | 8 No |
Answer / selvaraju
brick = 390 nos as per construction
sand = 0.30m3
cement= 1.90 bags
| Is This Answer Correct ? | 5 Yes | 7 No |
Answer / sheraz
No of Bricks= volume of total brickwork / volume of brick= 1 / 0.002 =500 NO.s
Volume of mortar is 30% of volume of brickwork = 0.30 cum
dry volume of mortar = 0.30 x 1.54 = 0.462 cum
So cement Quantity = 1x0.462/1+5 = 0.077 cum
divide it by the volume of cement bag that is 0.0347 = 0.077 / 0.0347 = 2.22 bags
sand quantity = 5 x 0.462 / 1+5 = 0.385 cu m
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / bhupendra singh panwar
.230*1*1=.230
dry mortar 30%
.069/6=0.0115
cement= .35 beg
sand =.0575 cum
brick =115 nos.
| Is This Answer Correct ? | 0 Yes | 6 No |
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
HOW CAN DESIGN LENGTH,WIDTH AND HEIGHT THE FOUNDATION FOR THREE FLOOR BUILDING?
How to calculate paint drums per meter square
how do understand the plinth beam croos section diagram
What do mean by freeway ?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
How much binding wire is required for one tone reinforcement ?
21 Answers ARS, Gammon, L&T, Lodha, Pratibha Industries,
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
In concrete mix, water is required . we tried in case of water we are used milk. what hapened
Can we provide lapping of R/f steel for plinth beam in support portion(At column)?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)