How to calculate paint
drums per meter square
No Answer is Posted For this Question
Be the First to Post Answer
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
what is the meaning or full form of 12T13 cables used in prestressed bridges
How to calculate the quantity for masonry(block and plaster)?
What is the meaning of "TOR" ??
Define current ucs?
What is meant by solid geometry?
plumbing CPVC fitting FTE Brass full form
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
Define Chimney in Thermal power plant?
how to calculate of m20 c.c road work 1cu.m
Approximate weight of a modular brick?
What is different type of bills?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)