How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / brajesh rai
brick 500
cement 1.6 bags
sand 0301 m3
| Is This Answer Correct ? | 8 Yes | 11 No |
Post New Answer View All Answers
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How much cement will require for 1Rmt Skirting laying
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is an ortho mode?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Define aligned dimension?
if the nitrates more than 45mg/l in water lead to disease then what is it called
How to determine spacing of bars in slabs or beams
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How to calculate the quantity of ingredients of M20 grade concrete?
for pretensioning which will yield first and same for post tensioning?
What is the sugested procedure of water purification for public supply?
For what building Built-on balconies are preferable? What are the advantages?
What is the use of offset command?