How much binding wire is required for one tone reinforcement ?
Answers were Sorted based on User's Feedback
Answer / harathi nitin
As per Joglaker (Quantity Surveyor Book) it is mentioned as
for every quintal of steel reinforcement ( 1 quintal =
100kg) 0.9 to 1.3kg of binding wire is required
for 100kg of steel reinforcement = 0.9 to 1.3kg of binding
wire
for 1 tonne (1000kg) = 9 to 13kg binding wire will be
required
| Is This Answer Correct ? | 168 Yes | 19 No |
Answer / a.ramachandran
approximate 8kg, it is based upon thumb rule.
| Is This Answer Correct ? | 81 Yes | 36 No |
Answer / pradipkrdeb
It should be 5 Kg to 6 Kg for one tone reinforcement.
| Is This Answer Correct ? | 115 Yes | 84 No |
Answer / siva
Upto 16mm dia = 6.90/7.20kgs
20mm to 32mm = 8.00/8.30kgs
| Is This Answer Correct ? | 52 Yes | 24 No |
Answer / t.chandrasekar
10 kg of binding wire is normally required for tying 1tonne
of reinforcement rods
| Is This Answer Correct ? | 43 Yes | 20 No |
Answer / srinu.s
Genearly used for binding wire for 1tone
up to 8mm to 10 mm steel = 5kg/tone
12 mm to 16 mm steel= 6.5 to 7.65 kg/tone
20mm to 32 mm steel= 8.2 to 9.85 kg/tone
| Is This Answer Correct ? | 31 Yes | 12 No |
Answer / jitendra
it depends on reinforcement work and gague of binding wire,
for overall calculation 12 kg consumed for Residential
building .steel binding wire
| Is This Answer Correct ? | 34 Yes | 18 No |
Answer / surendra pal singh
one tone reinforcement required binding wire 10kg to 13kg
Note- depend on rcc strecture residential & commercial.
| Is This Answer Correct ? | 19 Yes | 3 No |
please describe clear cover in column from stirups to face
explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
How to find the material quantity in a cement Sand mortar for Stone masonry?
How many modular bricks are required for 1 cubic meter of brick masonry?
14 Answers ITI, L&T,
what is a minimum strength recommented for aerocon blocks?
How many feet are in 4 square yards?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
How do you finishing structure....any one structure ....
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
the plan area of a building 10*15 of superstructure 0.30 then plinth area is
what mean By core Billing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)