Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How much binding wire is required for one tone reinforcement ?

Answers were Sorted based on User's Feedback



How much binding wire is required for one tone reinforcement ?..

Answer / harathi nitin

As per Joglaker (Quantity Surveyor Book) it is mentioned as
for every quintal of steel reinforcement ( 1 quintal =
100kg) 0.9 to 1.3kg of binding wire is required

for 100kg of steel reinforcement = 0.9 to 1.3kg of binding
wire

for 1 tonne (1000kg) = 9 to 13kg binding wire will be
required

Is This Answer Correct ?    168 Yes 19 No

How much binding wire is required for one tone reinforcement ?..

Answer / a.ramachandran

approximate 8kg, it is based upon thumb rule.

Is This Answer Correct ?    81 Yes 36 No

How much binding wire is required for one tone reinforcement ?..

Answer / pradipkrdeb

It should be 5 Kg to 6 Kg for one tone reinforcement.

Is This Answer Correct ?    115 Yes 84 No

How much binding wire is required for one tone reinforcement ?..

Answer / siva

Upto 16mm dia = 6.90/7.20kgs
20mm to 32mm = 8.00/8.30kgs

Is This Answer Correct ?    52 Yes 24 No

How much binding wire is required for one tone reinforcement ?..

Answer / t.chandrasekar

10 kg of binding wire is normally required for tying 1tonne
of reinforcement rods

Is This Answer Correct ?    43 Yes 20 No

How much binding wire is required for one tone reinforcement ?..

Answer / srinu.s

Genearly used for binding wire for 1tone
up to 8mm to 10 mm steel = 5kg/tone

12 mm to 16 mm steel= 6.5 to 7.65 kg/tone

20mm to 32 mm steel= 8.2 to 9.85 kg/tone

Is This Answer Correct ?    31 Yes 12 No

How much binding wire is required for one tone reinforcement ?..

Answer / jitendra

it depends on reinforcement work and gague of binding wire,
for overall calculation 12 kg consumed for Residential
building .steel binding wire

Is This Answer Correct ?    34 Yes 18 No

How much binding wire is required for one tone reinforcement ?..

Answer / surendra pal singh

one tone reinforcement required binding wire 10kg to 13kg
Note- depend on rcc strecture residential & commercial.

Is This Answer Correct ?    19 Yes 3 No

How much binding wire is required for one tone reinforcement ?..

Answer / karthik

8kg required for 1ton

Is This Answer Correct ?    33 Yes 18 No

How much binding wire is required for one tone reinforcement ?..

Answer / guest

10kg

Is This Answer Correct ?    24 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

sir what is the mean of WBM

2 Answers  


How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?

4 Answers  


which Indian standerd code is used for billing

4 Answers   Desai Construction, DLF, NKG Infrastructure,


what is assumption consumption of steel per m3 for raft

2 Answers  


Explain the different types of building contracts?

0 Answers  


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

0 Answers   GeoTechnology,


What is the procedure of Waterproofing in toilet sunken area ?

2 Answers   ACIL,


why we used shahabad stone (ladi) in box type water proofing.what is the main roll of shahabad stone?

2 Answers  


how do understand the plinth beam croos section diagram

1 Answers  


What is the difference between BC and SDBC

1 Answers  


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

0 Answers   Vishal Pipeline And Engineering,


What should be the PH value of water for irrigation purpose

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)