how much time will take for G+22 building for completion?
activity wise like excavation,sub
structure,superstructure,finishing,handover?
Answers were Sorted based on User's Feedback
Answer / mohammed shahid
Well, there are many factors the completion duration depends
on and a duration for the project of G+22 cannot be derived
and said to be so-and-so months, as not everything stays
ideal and as planned.
1. For Excavation - Area of the building and the depth and
also the type of earth we're excavating. (Hard rock takes a
longer duration than the soil)
2. Sub-structure - As you've mentioned it is a G+22, i'm
assuming there is no basement but usually a G+22 has
2basements. Hence as per your question and details provided
we're omitting the basements but still the area of the
building plays a major role and also the structural (RCC)
vertical members and the types of foundations. If it is a
raft foundation, it takes lesser time with say A number of
manpower and if its isolated footings with a few combined
footings with the same A number of manpower then the
duration might triple.
3.Superstructure - Depends on the area, the vertical
members, the depth of the beams, structural projections,
number of lift shafts and staircases. One suggestion here is
the "SLAB CYCLE" can be derived and the same an be
multiplied by 22 for the entire structural (RCC) work of the
building.
4.Finishing - The same concept of "SLAB CYCLE" can be
derived and multiplied by 22 for the finishing duration of
the building.
5.Handover - This shall include attending to the snagging
list of activities and rectification works if any. the same
can be considered as approximately 60days.
Still if the Interviewer demands for a duration at the end
of the above explanation (presuming he will not), you can
give him an approximate figure of 24months maximum.
Is This Answer Correct ? | 5 Yes | 0 No |
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
what is difference between tor steel & TMT STEEL?
in the earthquqke the profile of water on dam is parabolic or not
what is mean by bulking of sand?
How can we calculate the cement Quantity in M25?
2 Answers JK Associates, Vardhman, Wave Infratech,
How many steel is require in one cubic meter area?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
0 Answers NCC, Sobha Developers,
Do you expect there to be many jobs for civil engineers going into the future? What are the three main drawbacks of being a civil engineer? What are the three best things about being a Civil engineer? What amount of vacation time is available to you? Is the time paid? What are the usual hours of work required? Is it possible, or common, to work from home? How much time do you spend on the site of your projects? What type of schooling is required to be a civil engineer? How many years are required to complete this education?
Which factor affects the use of GSB material for different types of road works? What makes a material suitable to use for GSB??
How we decide the the load combinations for design of RCC structures?
how to calculate the quantity of plaster.
what is the formular for measuring minimum depth of a foundation