brick size= .230*.115*.75
1/.230*.115*.75 = 500
10 mm mortar consider now our brick size is .240*.125*.85
1/.240*.125*.85 =500
392 = 500
500-392= 108 bricks
now 108*0.00255 = 0.275 cu m
for mortar 1:6
cement = 1/7*0.275 = 0.0393/0.0345 = 1.13 bag
sand = 6/7*0.275 = 0.023 cu m
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What are the joints wants to made in masonry where door opening, arches like etc..
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What are the phases inspections are done by local authority while construction?
What is reinforced concrete?
What is the difference between yeild strength and compressive strength of steel???
How to find out slope footing concrete
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
States some of the commonly used commands in cad software’s?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how to calculate spacing rod in column
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how much cost of single coat 20mm thick plastering per sqre meter
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is difference between combin footing & rapt footing