How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answers were Sorted based on User's Feedback
Answer / zuber ahmed
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.
Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags
Sand required = 5/6 X 1.35 = 1.125 cu.m.
Bricks required = 500 Nos.
Is This Answer Correct ? | 10 Yes | 43 No |
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
What is the Hardness of M-40 grade concrete, general and theoratical
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
0 Answers Golden Bridge Contracting,
what is the cutting length of 90 degree bend in four corner ring in column of 8mm dia size of column 450mmx250mm of clear cover 20mm?
13 Answers Abhiram Infra Projects, Al-Darwish, Sobha Developers,
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
what is the dimensions of river sand truck trailer or trolly ?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
Explain the various stages of the project planning process in construction?
What is mean by Rolling Margin Of Steel????
4 Answers Dilip Buildcon, L&T, NCCL,
What are some structures that are subjected to fatigue?
How to convert n/mm2 in to kg/cm2?
38 Answers Rvr Projects Pvt Ltd, Soma Enterprises, Unitech, Wipro,