Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answers were Sorted based on User's Feedback



how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / himanth kumar

Consider for 1CUM of concrete is to be prepare,For that

M15 is a nominal mix, its proportion is 1:2:4

for 1cum of final mix(Dence) is required, 1.50 to 1.55 Cum
of loose ingredients with the required proportion we want
to add.

Based on that take avg of 1.50 & 1.55 is 1.52

Total proportion = 1+2+4 = 7

For Cement Qty = 1.52/7=0.217 Cum of cement required to
prepare 1Cum of M15 concrete.But cement is always taken in
Weight.For that the unit weight of cement is 1440 KG/Cum
Total cement required = 0.217x1440= 312.68 Kgs.

Sand = 0.217 x 2 =0.434 Cum

Metal or Aggregate = 0.217 x 4 =0.868 Cum.

Is This Answer Correct ?    1121 Yes 173 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / adishankar (quantity surve

DETAILS:

cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57

unit weigth of cement is 1440kg/cum

one bag of cement =50/1440=0.034722 cum

solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs

solution of sand = 0.22*2=0.44cum

2 is the mixing of propotion

soolution of metal = 0.22*4=0.88cum

4 is the mixing of propotion

say i cum of cement conceret 1:2:4 ratio

cement = 6.33 bags

sand = 0.46 cums

metal = 0.88 cums


this is one type of solution

unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum

so cenment = 1.54/7=0.22
0.22*1440=316.8 kgs/cum
sand = 0.22*1750=385kgs/cum

metal = 0.22*2000=440kgs/cum

Is This Answer Correct ?    555 Yes 92 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / pinkal

Here volume is (1 cement bag=1.25 cu.ft)
cement 1 1.25 cu.ft
sand 2 2.50 cu.ft
metal 4 5.00 cu.ft
-----------
8.75 cu.ft total volume

Is This Answer Correct ?    717 Yes 336 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / raja babu.k

Sample = 1 M3 of M15 i.e 1:2:4

Aggregate = 20mm

Final Mixture and Loose Aggregate Ratio is 1.57(in practies)

SO CALCULATION FOR 1:2:4

1+2+4=7

CEMENT = (1.57/7)X1=0.2242 M3X1440=322.8Kg= 6.45 Bags
RIVER SAND= (1.57/7)X2=0.4485 M3X35.314 = 15.83 Cft
AGGREGATE = (1.57/7)X4=0.8971 M3X35.314 = 31.68 Cft

Is This Answer Correct ?    220 Yes 43 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / sjtbehera

The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum

Is This Answer Correct ?    380 Yes 252 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / arun

DETAILS:

cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57

unit weigth of cement is 1440kg/cum

one bag of cement =50/1440=0.034722 cum

solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs

solution of sand = 0.22*2=0.44cum

2 is the mixing of propotion

soolution of metal = 0.22*4=0.88cum

4 is the mixing of propotion

say i cum of cement conceret 1:2:4 ratio

cement = 6.33 bags

sand = 0.46 cums

metal = 0.88 cums


this is one type of solution

unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum

so cenment = 1.54/7=0.22
0.22*1440=316.82 kgs/cum
sand = 0.44*1750=770kgs/cum

metal = 0.88*2000=1760kgs/cum

Is This Answer Correct ?    92 Yes 21 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / sandeepthakur1981

for 01 cu.m.

cement=1.52/7 =.217
= .217x30= 6.51 bags.

sand= .217x2= 0.434cu.m

aggregate= .217x4= 0.868cu.m

Is This Answer Correct ?    94 Yes 35 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / the engineer

In order to estimate the quantity of loose materials to have
100 cubic feet wet concrete we first multiply the wet
concrete by 1.54.
e.g 100x1.54=154 cubic feet of dry materials we need.

now come to the ratio of concrete which is 1:2:4 so sum of
the ratio will be 1+2+4=7

calculating separately each material:

Cement: 1/7x154 = 22 cubic feet
where 1 bag of cement measured 1.25 cubic feet approx
therefore 22/1.25 = 17.6 bags of cement. 1 bag contains 50kg
cement so total cement by weight we need for 100 cubic feet
concrete = 17.6x50 = 880kgs

sand: 2/7x154 = 44 cubic feet

coarse aggregate: 4/7x154 = 88 cubic feet

Is This Answer Correct ?    59 Yes 15 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / m

ratio is 1:2:4
1+2+4=7

100cft concrete
100*1.54=
then divide by 7
then divide by 1.25 you wil have cement bag

Is This Answer Correct ?    71 Yes 29 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / chetan khairnar

Note: For 1m3 wet concrete = 1.52m3 dry concrete approximately
SP.Wt of concrete= 1440 kg/m3 (or) 1.44 t/m3
1 bag of cement = 50 Kg
Example:- for 20 m3 volume of concrete.

a) Quantity of cement required = (1:2:4)
=1/(1+2+4) x 1.52 × 20 = 4.14m3 x 1440/50 =119.26 bags

b)Quantity of Sand required = (1:2:4)
=2/(1+2+4)×1.52x20=8.28m3 OR =4.14 x 2=8.28 m3.

c)Quantity of course aggregate = (1:2:4)
=4/(1:2;4) x 1.52 x20 = 16.56m3 OR =4.14 x 4= 16.56m3.

If qty. calculate in Kg just multiply by its Sp. wt of sand
or aggregate.

Is This Answer Correct ?    68 Yes 28 No

Post New Answer

More Civil Engineering Interview Questions

we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

0 Answers  


please help me to find a mix design ratio for M40....

2 Answers  


very simple or less time consuming formula for reinforcement calculation by moment

0 Answers  


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

0 Answers   CDM Smith,


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

0 Answers  


What are the different types of pile founations used?

9 Answers  


What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.

5 Answers  


How to take labor charges for construction of 1cum of concrete?

0 Answers  


Advantages and Disadvantages of using fly ash bricks over clay bricks?

11 Answers   Pradhi Engineering,


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

0 Answers   SSC,


How you can turn off the display for dimension in CAD?

0 Answers  


How much block, cement,sand,is required for 1 sqmt of 200*200*400 block work

2 Answers   CCCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)