Consider for 1CUM of concrete is to be prepare,For that
M15 is a nominal mix, its proportion is 1:2:4
for 1cum of final mix(Dence) is required, 1.50 to 1.55 Cum
of loose ingredients with the required proportion we want
to add.
Based on that take avg of 1.50 & 1.55 is 1.52
Total proportion = 1+2+4 = 7
For Cement Qty = 1.52/7=0.217 Cum of cement required to
prepare 1Cum of M15 concrete.But cement is always taken in
Weight.For that the unit weight of cement is 1440 KG/Cum
Total cement required = 0.217x1440= 312.68 Kgs.
Sand = 0.217 x 2 =0.434 Cum
Metal or Aggregate = 0.217 x 4 =0.868 Cum.
| Is This Answer Correct ? | 1121 Yes | 173 No |
Answer / adishankar (quantity surve
DETAILS:
cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57
unit weigth of cement is 1440kg/cum
one bag of cement =50/1440=0.034722 cum
solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs
solution of sand = 0.22*2=0.44cum
2 is the mixing of propotion
soolution of metal = 0.22*4=0.88cum
4 is the mixing of propotion
say i cum of cement conceret 1:2:4 ratio
cement = 6.33 bags
sand = 0.46 cums
metal = 0.88 cums
this is one type of solution
unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum
so cenment = 1.54/7=0.22
0.22*1440=316.8 kgs/cum
sand = 0.22*1750=385kgs/cum
metal = 0.22*2000=440kgs/cum
| Is This Answer Correct ? | 555 Yes | 92 No |
Answer / pinkal
Here volume is (1 cement bag=1.25 cu.ft)
cement 1 1.25 cu.ft
sand 2 2.50 cu.ft
metal 4 5.00 cu.ft
-----------
8.75 cu.ft total volume
| Is This Answer Correct ? | 717 Yes | 336 No |
Answer / raja babu.k
Sample = 1 M3 of M15 i.e 1:2:4
Aggregate = 20mm
Final Mixture and Loose Aggregate Ratio is 1.57(in practies)
SO CALCULATION FOR 1:2:4
1+2+4=7
CEMENT = (1.57/7)X1=0.2242 M3X1440=322.8Kg= 6.45 Bags
RIVER SAND= (1.57/7)X2=0.4485 M3X35.314 = 15.83 Cft
AGGREGATE = (1.57/7)X4=0.8971 M3X35.314 = 31.68 Cft
| Is This Answer Correct ? | 220 Yes | 43 No |
Answer / sjtbehera
The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum
| Is This Answer Correct ? | 380 Yes | 252 No |
Answer / arun
DETAILS:
cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57
unit weigth of cement is 1440kg/cum
one bag of cement =50/1440=0.034722 cum
solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs
solution of sand = 0.22*2=0.44cum
2 is the mixing of propotion
soolution of metal = 0.22*4=0.88cum
4 is the mixing of propotion
say i cum of cement conceret 1:2:4 ratio
cement = 6.33 bags
sand = 0.46 cums
metal = 0.88 cums
this is one type of solution
unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum
so cenment = 1.54/7=0.22
0.22*1440=316.82 kgs/cum
sand = 0.44*1750=770kgs/cum
metal = 0.88*2000=1760kgs/cum
| Is This Answer Correct ? | 92 Yes | 21 No |
Answer / sandeepthakur1981
for 01 cu.m.
cement=1.52/7 =.217
= .217x30= 6.51 bags.
sand= .217x2= 0.434cu.m
aggregate= .217x4= 0.868cu.m
| Is This Answer Correct ? | 94 Yes | 35 No |
Answer / the engineer
In order to estimate the quantity of loose materials to have
100 cubic feet wet concrete we first multiply the wet
concrete by 1.54.
e.g 100x1.54=154 cubic feet of dry materials we need.
now come to the ratio of concrete which is 1:2:4 so sum of
the ratio will be 1+2+4=7
calculating separately each material:
Cement: 1/7x154 = 22 cubic feet
where 1 bag of cement measured 1.25 cubic feet approx
therefore 22/1.25 = 17.6 bags of cement. 1 bag contains 50kg
cement so total cement by weight we need for 100 cubic feet
concrete = 17.6x50 = 880kgs
sand: 2/7x154 = 44 cubic feet
coarse aggregate: 4/7x154 = 88 cubic feet
| Is This Answer Correct ? | 59 Yes | 15 No |
Answer / m
ratio is 1:2:4
1+2+4=7
100cft concrete
100*1.54=
then divide by 7
then divide by 1.25 you wil have cement bag
| Is This Answer Correct ? | 71 Yes | 29 No |
Answer / chetan khairnar
Note: For 1m3 wet concrete = 1.52m3 dry concrete approximately
SP.Wt of concrete= 1440 kg/m3 (or) 1.44 t/m3
1 bag of cement = 50 Kg
Example:- for 20 m3 volume of concrete.
a) Quantity of cement required = (1:2:4)
=1/(1+2+4) x 1.52 × 20 = 4.14m3 x 1440/50 =119.26 bags
b)Quantity of Sand required = (1:2:4)
=2/(1+2+4)×1.52x20=8.28m3 OR =4.14 x 2=8.28 m3.
c)Quantity of course aggregate = (1:2:4)
=4/(1:2;4) x 1.52 x20 = 16.56m3 OR =4.14 x 4= 16.56m3.
If qty. calculate in Kg just multiply by its Sp. wt of sand
or aggregate.
| Is This Answer Correct ? | 68 Yes | 28 No |
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
please help me to find a mix design ratio for M40....
very simple or less time consuming formula for reinforcement calculation by moment
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
What are the different types of pile founations used?
What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.
How to take labor charges for construction of 1cum of concrete?
Advantages and Disadvantages of using fly ash bricks over clay bricks?
11 Answers Pradhi Engineering,
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How you can turn off the display for dimension in CAD?
How much block, cement,sand,is required for 1 sqmt of 200*200*400 block work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)