The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum
Is This Answer Correct ? | 380 Yes | 252 No |
Post New Answer View All Answers
What is the sugested procedure of water purification for public supply?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
what is the ingredient value of 40mm and 20mm aggregates?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What are the alternate material for steel, Sand and aggregate
What is the use of extruded feature in solidsworks?
Explain what is Hybrid Foundation?
Cement consumption of one cubic meter of aerocon blocks masonry?
In jack arch floor, the rise is kept?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is the permanent solution applied for restoration of leaning tower of pisa?
how to determine H- zone in a column? where it will occur?
How can I make justification between using concrete grade c35 compare c37?