very simple or less time consuming formula for reinforcement calculation by moment
No Answer is Posted For this Question
Be the First to Post Answer
What things you need to take care of before building a kitchen island?
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
how to find steel quantity
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
how to check the quality of concrete
why main steel is to be reinforced in shorter direction in case of slab?
11 Answers CG, ESRT, Kirloskar, Lokmat, Priya,
What is construction joint and expansion joint in CC pavements
Special thing in designing a overhead reservoir ? which is different from an ordinary design
what is concrete canvas?
what is the wait of cement in different concrete mixes from M15 TO M50
what is conrete grade ,how are depent on concrete grad and size of concrete?
In a day One Mason can fix How many sqm of 60x60 tiles?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)