we have a bore well 275 depth & water is deliver at
distance of 1000 feet from the borewell here iam not
include the distance of depth and the deliver water
horizontally at our reserviour tank on ground level
No Answer is Posted For this Question
Be the First to Post Answer
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is Reason of Alkali-Silica reaction in Concrete mix and its remedies?
How many bricks required for 1 cu.m
What is the meaning of 'variation' in construction of residential buildings
600 brass equal to how many cubic meter..
Define aligned dimension?
How to determine spacing of bars in slabs or beams
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Define graphics window?
shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)