how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / raja babu.k
Sample = 1 M3 of M15 i.e 1:2:4
Aggregate = 20mm
Final Mixture and Loose Aggregate Ratio is 1.57(in practies)
SO CALCULATION FOR 1:2:4
1+2+4=7
CEMENT = (1.57/7)X1=0.2242 M3X1440=322.8Kg= 6.45 Bags
RIVER SAND= (1.57/7)X2=0.4485 M3X35.314 = 15.83 Cft
AGGREGATE = (1.57/7)X4=0.8971 M3X35.314 = 31.68 Cft
Is This Answer Correct ? | 220 Yes | 43 No |
Post New Answer View All Answers
What is the quantity of cement in mix m20 concrete?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What applicable rate of wct in bihar
Define mirror?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
how much need sand and cement for 1 cft roof construction?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What should be the standard roof height like to be?
PL.tell me about civil engineering questions with answer
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish