how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / raja babu.k
Sample = 1 M3 of M15 i.e 1:2:4
Aggregate = 20mm
Final Mixture and Loose Aggregate Ratio is 1.57(in practies)
SO CALCULATION FOR 1:2:4
1+2+4=7
CEMENT = (1.57/7)X1=0.2242 M3X1440=322.8Kg= 6.45 Bags
RIVER SAND= (1.57/7)X2=0.4485 M3X35.314 = 15.83 Cft
AGGREGATE = (1.57/7)X4=0.8971 M3X35.314 = 31.68 Cft
| Is This Answer Correct ? | 220 Yes | 43 No |
Post New Answer View All Answers
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what mean By core Billing
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
what is modular brick and it size
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is diversion?
what will be price of 1:2:4pcc per kg?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Why was the empire state building made of steel?
what is the calculation of raw material for 0.35cum of m-15
what is the Asfalt test?in road constraction..?
How can we demolish concrete beams?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??