How much block, cement,sand,is required for 1 sqmt of 200*200*400 block work..

Answer / divyesh s mistry

NUMBER OF BLOCKS REQUIRED=10 TO 12 NOS.
FOR BLOCK MASONARY WE NEED TO USE RICH CEMENT MORTAR SO THE
PREFERRABLE RATIO FOR CEMENT & SAND IS 1:4
VOLUME OF MORTAR=HORIZONTAL JOINTS
5 ROWS OF 200MM WIDE
20MM THICK MORTAR=5*.2*.02=.02CUBIC METER
VOLUME OF VERTICAL JOINTS=5*2.5*.2*.2*.02=0.01CUBIC METRE
TOTAL=.03+ADD 30% WASTAGE=.039CUBIC METRE OF CEMENT MORTAR
REQUIRED
NOW FOR PROPORTION OF 1:4

WT. OF CEMENT IN 1 SQ.MTR=.039X1X(1/5)X1440=11.232KG/SQ.MTR
VOLUME OF SAND=.039X1X(4/5)=.0312CUBIC METRE

Is This Answer Correct ?    32 Yes 13 No

How much block, cement,sand,is required for 1 sqmt of 200*200*400 block work..

Answer / ahmed

For 1 SqMt
Morter=0.01
Cement=13kg
Sand=44kg,Plasticiser(ml)=12
if u Want to know direct Just go through this website,You
will get all with Materail Cost & labour Cost
http://www.sydenhamsbuildersmerchant.co.uk/calc.htm

Is This Answer Correct ?    13 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

How to find the thickness of RCC concrete ex.10'x10'. what"s the thickness, we provide and what"s the formula?

2 Answers   L&T,


HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?

1 Answers  


for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?

2 Answers  


What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)

7 Answers  


mix design procedure, i.e m15 to m40

1 Answers   Power Grid, SMG,






Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

0 Answers  


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

0 Answers  


How do we determine the specific gravity of a cement?

0 Answers  


how to calculate the quantity of steel used for construction..

1 Answers   Salam,


what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.

2 Answers   TATA, Vastu Kirti Enterprises,


how to cement bag calculate m25 grade

4 Answers   Cozy Group,


how much cement is contained in 1:5 ratio 4" brickwork for 1 sqft

1 Answers   C&C, Gammon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)