how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / adishankar (quantity surve
DETAILS:
cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57
unit weigth of cement is 1440kg/cum
one bag of cement =50/1440=0.034722 cum
solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs
solution of sand = 0.22*2=0.44cum
2 is the mixing of propotion
soolution of metal = 0.22*4=0.88cum
4 is the mixing of propotion
say i cum of cement conceret 1:2:4 ratio
cement = 6.33 bags
sand = 0.46 cums
metal = 0.88 cums
this is one type of solution
unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum
so cenment = 1.54/7=0.22
0.22*1440=316.8 kgs/cum
sand = 0.22*1750=385kgs/cum
metal = 0.22*2000=440kgs/cum
| Is This Answer Correct ? | 555 Yes | 92 No |
Post New Answer View All Answers
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What is meant by scaffolding coefficient?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
how to calculate total cost for slab 35'×8'
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
Define What is passive earth pressure ?
how to take concrete quantity for precast segment for viaduct project?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what"s the sort of beams?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
how water proof chemicals act in concrete to avoid leek?
what is flexible and rigid footing?