Answer / selva mani
the structure which is above the ground level is called
super structure...
| Is This Answer Correct ? | 6 Yes | 6 No |
Answer / amol s.bidwai
super structure is the part of the stucture which is above
the ground level.
| Is This Answer Correct ? | 4 Yes | 4 No |
Answer / suneendra
Construction above the basement or foundation, supported by an infrastructure which in turn is supported by the substructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kapil gupta
Structure above plinth level is superstructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ajay
IT IS THE PART OF THE BUILDING,ABOVE THE PLINTH LEVEL WHICH
CAN YOU SEEN
| Is This Answer Correct ? | 7 Yes | 8 No |
Answer / bembol rocco
super structure is the part of the stucture which is above
the ground level. am i correct? comment please....
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / muzamil
In civil engineering super structure is buid on the
foundation which which distribute the load equally to the
sub structure ie foundation.
| Is This Answer Correct ? | 1 Yes | 2 No |
super structure is rest on above the plinth beam.we can
see the see the super structure.
| Is This Answer Correct ? | 0 Yes | 1 No |
37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil this result use in construction work
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
types of piles detail,
0 Answers DLF, IVRCL, JP Group,
For 1cu.m how many bricks required practically
How do you compute the volume of airflow?
What should be the required steel in column, beam and slab
What is Gsb tollens ?
brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum
what is the degree of residential building stair case ?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)