what is mean by super structure?
Answers were Sorted based on User's Feedback
Answer / selva mani
the structure which is above the ground level is called
super structure...
| Is This Answer Correct ? | 6 Yes | 6 No |
Answer / amol s.bidwai
super structure is the part of the stucture which is above
the ground level.
| Is This Answer Correct ? | 4 Yes | 4 No |
Answer / suneendra
Construction above the basement or foundation, supported by an infrastructure which in turn is supported by the substructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kapil gupta
Structure above plinth level is superstructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ajay
IT IS THE PART OF THE BUILDING,ABOVE THE PLINTH LEVEL WHICH
CAN YOU SEEN
| Is This Answer Correct ? | 7 Yes | 8 No |
Answer / bembol rocco
super structure is the part of the stucture which is above
the ground level. am i correct? comment please....
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / muzamil
In civil engineering super structure is buid on the
foundation which which distribute the load equally to the
sub structure ie foundation.
| Is This Answer Correct ? | 1 Yes | 2 No |
super structure is rest on above the plinth beam.we can
see the see the super structure.
| Is This Answer Correct ? | 0 Yes | 1 No |
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
The point of contraflexure occurs in
How do we say The LAP LENGHT is 50D to 60D ?????
What are the methods of measurement? Describe it shortly
how to calculate the length diamond shaped striupps in column
difference between trapezoidal and pedestal footing and how the load acts on that
0 Answers Golden Construction,
how to calculate the load bearing capacity of slab hos thickness and steel are already given?
WHAT IS MEANT BY AEOLIAN SOIL?....
4 Answers L&T, Totem Infrastructure,
what are the Task work of different labour.?
What are the types of test used to determine soil bearing capacity
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
What is anchorage length
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)