Answer Posted / muzamil
In civil engineering super structure is buid on the
foundation which which distribute the load equally to the
sub structure ie foundation.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is the best type of wood glue?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Explain what are the problems one might face while having a Cantilever balcony?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
what is smart building materials?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is the meaning of soil reinforcement?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25