Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
| Is This Answer Correct ? | 30 Yes | 0 No |
why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?
what is kribs is supporting?
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
What is difference between limit state and working stress method? How it is applies in building structure.
can you provide a link for manual design of building?
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
Why alternate bars are given bent-up in slab and how to decide the length of bent up?
concrete cube strength if fail 1 no in 7 days .What is the solution
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
what are the stress act on circular slab?
parts of stair-case?
how many types of hydraulic coefficints and their values
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)