Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
| Is This Answer Correct ? | 30 Yes | 0 No |
what is pmc(in rigid pavement)
what is formula for concrete mix ratio in m20, m25 and m30?
2 Answers Reddy Veeranna Constructions,
explain five benefits of using standard terminology in the measurement process?
Why shear forces are usually neglected in column design?
how to know the one way or two slab
3 Answers ASC, Harmal Enterprises,
what are all the new civil construction materials?what are the new concepts ?
what is the criteria for the finalisation of pavement thickness in road project?
What are the methods to do a estimate.
1:6 ratio block work purpose how much cement used
1 Answers Spago, VRC Constructions,
25. Are you willing to work overtime?
How to decide/consider the grade of bitumen for dbm.
If a steel ring is 40 cm square and it's hooks are 8 dia of bar. The steel is 8mm. What is it cut length?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)