Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
Is This Answer Correct ? | 30 Yes | 0 No |
How to calculate the length of chairs provided to support the top rebar in concrete foundation
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
For a RCC section with congested reinforcement , what is the compaction factor
2 Answers Arihant, GMR, Gulf International Contracting, NBCC,
what is the standard mix proportion of m60 grade?
WHY DO YOU WANT TO WORK HERE?
what is the used civil engg?
A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?
Explain why concrete barriers have curved surface profiles?
what is the name of coarse sand which is used in making of concrete
why we use cement for concrete
1:6 brick masonry cement and sand calculations
what is stressing