Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
| Is This Answer Correct ? | 30 Yes | 0 No |
tell me height of colum casting if slab height 3mtr beam thikness 500mm and slab thik 150mm please write formula sir
What are the different types of civil engineering?
For what building Built-on balconies are preferable? What are the advantages?
what are the construction sequences in DAM, Hygh Way / Road, Thermal Power Plant, Hydro Power Plant, Tunnel ?
how to find quantity for binding wire steel.
which lime used in white washing
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
why we leave expansion joint between to complex
which type of cement uses for R.C.C. & why?
2 Answers Ideal Construction,
Instrument used for determining PH of water
What is the meaning and full form of FTA and MTA in plumbing material
Is there any difference in IS 456 and IRC 15?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)