Answer / guest
1.simply suported beam only
2.cantilever beam only
3.countious beam only
Is This Answer Correct ? | 68 Yes | 28 No |
Answer / sanjay semwal
where bending moment is
zero and shear force is
maximum
Is This Answer Correct ? | 18 Yes | 2 No |
Answer / shashi kumar
where shear force and bending moment zero
Is This Answer Correct ? | 18 Yes | 10 No |
Answer / sjtbehera
Yes, the point where shear force is maximum and bending moment is zero.
It is very important to calculate shear reinforcment.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / muraliyadav
where the bending moment just becomes zero that point can
called as point of contraflexure
Is This Answer Correct ? | 6 Yes | 2 No |
Answer / adeel ahmed
It is a point during the analysis of structural components in which bending moment change its sign mean the point of zero bending moment and this occurs mostly in overhanging case.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / meet
Occurs in overhanging beams only at point where bendig moment is either zero or changes sign and the shear force at that point is maximum
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / suresh bariya
a Point where shear force and bending moment both are zero.
Is This Answer Correct ? | 1 Yes | 7 No |
How many Sqm can laid Vitrified tiles for flooring per day per masan?
plz tell me max persantage of sand for every mix design by volume or weight.
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
How many percentage extra considering in PEB roof sheet ?
As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?
2 Answers MBL Infrastructures,
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how do we design mix ratio?
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
what"s the formula find the cement consumption for brick work 12 thick wall 1 m2?
WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY EMPLOYED