what is mean by super structure?
Answers were Sorted based on User's Feedback
Answer / kiran
structure that built above the ground, which is rests on
foundation?
| Is This Answer Correct ? | 46 Yes | 7 No |
Answer / aswile mssika
super structure is the part of the stucture which is above
the ground level.
| Is This Answer Correct ? | 35 Yes | 8 No |
Answer / rajesh
the portion of a building above the ground or above its
foundation.
| Is This Answer Correct ? | 17 Yes | 7 No |
Answer / parthkumar salunke
up to plinth level it is called substructure and above
plinth level it is called superstructure.
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / praveen
it's the part of the structure, which rests above the
plinth level
| Is This Answer Correct ? | 17 Yes | 13 No |
Answer / usman ameer
super structure is the part of the stucture which is above
the ground level
| Is This Answer Correct ? | 4 Yes | 2 No |
all those constructions,are being constructed over on the sub superstructure is called super structure.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / muhammad junaid
Super structure is is base on sub structure and which is above the plinth level
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pradeep biswas
A super structure means the structure of the building which
includes beams, columns, slabs above ground level . Some
cases it can include outside brick work , chajja & lintels
also. IN short it can be the complete building structure
without internal finishes & foundation.
| Is This Answer Correct ? | 9 Yes | 8 No |
Aptitude, reasoning, quants, verbal and technical question
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
How to increse bearing capacity in soils (Stabilisation of soils)
In two way slab where should we stop the work at end of the day?
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
Machine mix is better than hand mixing to get––
What is dead load impact load live load
0 Answers Osmani Constructions,
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
how much sand requires for Light weight blocks for 100sqft
how to calculate of m20 c.c road work 1cu.m
how many nails in 1 sq mitar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)