Answer Posted / kapil gupta
Structure above plinth level is superstructure.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What is the difference between a wood shake and wood shingles?
What are the responsibilities of a construction manager?
explain what do you mean by the property development.
how to compute slab reinforcements on step by step procedures??
Explain the various stages of the project planning process in construction?
specifications of fe500 steel
Concrete cover for slab, column, beam and footing?
What in your past experience or education prepares you for the position for which you are applying
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how can we calculate steel value, depending on load
what is the service corridor?