Answer Posted / kapil gupta
Structure above plinth level is superstructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are advancements in civil engineering?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What does a construction cost covers and what does not?
What is rolling stock
i need gate exam civil engineering question papers with answers
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
what is the use of beam end forces while using a staad ? wha they are show
what pressure the NP2 class RCC pipe can sustain?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
how lap length is increased with increase of Grade of steel?
Which percentage of carpet area use in plot area of office building.
pls tell me , what is the water content
What is Grid floor and mention its advantages ?