Answer Posted / suneendra
Construction above the basement or foundation, supported by an infrastructure which in turn is supported by the substructure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is M40 _ TOR - EQ and B.F.S
what is mean by c32/40s concrete class
How much is the cover for slab?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Please tell me vasthu room sizes. Thanks.
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what isload waring calculation
How you can turn off the display for dimension in CAD?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
five benefits of using standard terminology in the measurement process
how to design and calculate materail quantity for concrete speedbreaker ?
Define graphics window?
what is the price of a cubic meter of concrete on international market?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)