Answer Posted / selva mani
the structure which is above the ground level is called
super structure...
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how calculate the bearing from two coordinates?
why the openings of sieves are square io size?
how much to get of BRC lapping in full yield and half yield ?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what motivates you to do a good job
how to determine H- zone in a column? where it will occur?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to compute slab reinforcements on step by step procedures??
how many digree of freedom in four bar chain
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6