Answer Posted / pv.giri
super structure is the part of the stucture which is above
the ground level
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What is alternate bid?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how can we construct building without foundation providing only grade beam at ground level
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is factor not to be taken in consideration in mix design?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
explain what do you mean by the property development.
what is the coefficient for running feet to cft coversion both area and price